Case study

ISC Applied Systems

Project

ALM solution supporting the development of all equipment, and of all electronic devices used in the field of rail transportation.

Services Offered

Methodologies: ALM engineering process

Business Needs

ISC Applied Systems have seen recent growth, and plan to launch several development projects for control and passenger information systems in the railroad industry. To increase productivity, ISC is looking to improve efficiency in terms of the management of technical requirements for projects and tests. They are hoping to obtain a CMMI 2 certification in doing so.

Solution

Logient proposed the ALM methodology to support project implementation. This methodology consists of deploying the ISC software and systems engineering processes in Atlassian JIRA to respond to information access requirements in real time, such as access to:

  • Reports regarding technical requirements for projects
  • Test reports
  • Useful data regarding business intelligence development

The reports and documents are available in electronic format, one step further into the digital world for ISC.

Result

All success criteria for the project were met across all technical details:

  • 20% reduction in requirement management time
  • 25% improvement in requisite data quality, as well as in the improvement in follow up report and control.
  • 5-10% reduction in errors
  • Better project evaluation throughout launch phases
  • Better time and cost management by making information connected to project requirements accessible for all developers, integrators, and tests in IRA.

About ISC Applied Systems

ISC Applied Systems provides passenger information systems in the public transit sector. The company designs, develops, and manufactures products that contribute to the comfort and safety of passengers, as well as to the reliable and secure functioning of transportation systems. The company is marketing its products on an international scale.


Technologies

  • Atlassian